List of C-BED Projects
As of October 15, 2007, there are a total of 237.2 MW of C-BED projects under contract as shown below. An additional 629.15 MW of C-BED projects are in negotiation.
- Excel Energy: 160.1 MW (plus 408.9 MW in negotiation)
- CMMPA: 10 MW
- GRE: 0 MW (Plus 140 MW in negotiation)
- SMMPA: 0 MW (plus 30 MW in negotiation)
- Minnesota Power: 32.5 MW (plus 20 MW in negotiation)
- MRES: 34.7 MW
- Otter Tail Power: 0 MW (plus 10.25 MW in negotiation)
- Dairyland Power: 0 MW (plus 20 MW in negotiation)
- MMPA: 0 MW
- Minnkota: 0 MW
- Interstate Power & LIght: 0 MW
- Basin Electric: 0 MW
More details can be found here.
|